Vermont’s Shelburne Museum will be fully powered by renewable energy when two new arrays constructed on museum property come online later this year. Construction of the first phase of the project, a 500-kW array on land adjacent to the museum campus, was completed in December 2020. The second phase, a separate, smaller 150-kW array, south.